AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Nasa jacket10/29/2022 NASA’s next-generation moon rocket, the Space Launch System (SLS) rocket with its Orion crew capsule perched on top, as it stands on launch pad 39B in preparation for the uncrewed Artemis 1 mission days before its first attempted launch at Cape Canaveral, Florida, U.S. Twelve astronauts walked on the moon back in the late 1960s and early 1970s during NASA’s Apollo program. Running years late and billions over budget, NASA’s new lunar exploration program is named Artemis after Apollo’s twin sister in Greek mythology. “We’re optimistic that we can knock this problem flat,” he told reporters. READ MORE: Fuel leak disrupts NASA’s 2nd attempt at Artemis launchĮngineers are hopeful that replacing a pair of seals in the hydrogen fuel lines at the bottom of the rocket will take care of any lingering leaks.Īs an extra precaution, the launch team plans “a kindler and gentler approach to tanking” during the final phase of the countdown, slowing the flow of fuel at times to reduce stress on the seals, according to Mike Bolger, a program manager. There already have been three trips to the pad this year for practice countdowns and, most recently, the thwarted launch attempts of Aug. The military would have to extend the certification of those batteries by an extra two weeks or more to avoid moving the rocket back to the hangar.īut every time the rocket moves between the hangar and launch pad adds “routine wear and tear, and I don’t want to do that” unless necessary, said chief engineer John Blevins. These batteries must be retested periodically, and that can only be done in the hangar. A woven bomber jacket featuring assorted patches on the sleeves, front NASA text, front and back National Aeronautics and Space Administration text with. Batteries are needed to activate the system if the rocket veers off course toward populated areas. To launch in late September, NASA needs the OK from the Space Force in Cape Canaveral, which oversees the rocket’s self-destruct system. 23, said Jim Free, who’s in charge of NASA’s exploration systems development. “We need to get the tanking test done and then we’ll have to look at what is the realism and schedule” to make a launch attempt as early as Sept. That around-the-moon mission would pave the way for the first human moon landing in 50 years, currently scheduled for 2025. #NASA JACKET TRIAL#The space agency wants to send the capsule into lunar orbit on a trial run, before putting astronauts on the next flight, in 2024. The Space Launch System rocket - the most powerful ever built by NASA - holds a crew capsule with three test dummies. #NASA JACKET SERIES#READ MORE: How NASA’s Artemis 1 launch will mark a new era in space explorationĪ series of hydrogen fuel leaks and other problems halted back-to-back launch attempts last week. Otherwise, the rocket will return to the hangar for additional work, delaying liftoff until at least October. If that test goes well - and if the Space Force extends a flight safety waiver - then NASA could take another stab at launching the 322-foot rocket in late September. Managers said Thursday they will conduct another test after the repairs to ensure all hydrogen fuel leaks are plugged. (AP) - NASA is replacing leaky seals in its moon rocket at the pad in hopes of launching it on its first test flight by the end of this month.
0 Comments
Read More
Leave a Reply. |